September 6, 2019

Allston Village Main Streets' Tree Pit Initiative has replaced 56 tree pits in Allston Village with Flexi-Pave, a permeable pavement. This pavement, which is completely porous, has created a smooth walking surface, increased the accessibility of the sidewalks, and allo...

June 17, 2019 - The Allston Village Main Streets Board of Directors announces Emma Walters’ departure as Executive Director of Allston Village Main Streets, effective July 17, 2019. Emma played a pivotal role in the growth, development, and sustainability of AVMS durin...

It's about bringing people together and connecting them...

This public art installation for the bridge over the MA-90 has the same aim. Inhabitants from the north side will meet inhabitants from the south side to create the largest community mural in Boston.

The project...

Please reload

Featured Posts

Maintenance on Tree Surrounds Allows for Increased Pedestrian Mobility

September 6, 2019

1/3
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

Phone: (617) 254-7564  |

Fax: (617) 254-2442  |

161 Harvard Ave # 11, Allston, MA 02134

©2017 BY ALLSTON VILLAGE MAIN ST. PROUDLY CREATED WITH WIX.COM